January 11th, 2018 – Vancouver, British Columbia; – LiCo Energy Metals Inc. (“the Company” or “LiCo”) TSX-V: LIC, OTCQB: WCTXF is pleased to report President & CEO Tim Fernback
Interviewed by Dr. Allen Alper of MetalsNews at: http://metalsnews.com/t1196893i
Dr. Allen Alper, PhD Economic Geology and Petrology, Columbia University, NYC, USA interviewed Tim Fernback for a Featured article that appeared January 11th, 2018 in MetalsNews.com. Dr. Alper was very impressed with Mr. Fernback’s leadership, progress and vision for LiCo Energy Metals Inc.
LiCo Energy Metals is a grassroots Canadian company that conducts exploration for lithium and cobalt metals used in the production of lithium‐ion batteries. LiCo Energy Metals has four ongoing projects in mining‐friendly jurisdictions within Canada, the United States, and Chile.
Dr. Alper learned from Tim Fernback, President and CEO of LiCo Energy Metals, that their properties are strategically located in some of the best areas, where the presence of lithium and cobalt has been found historically. LiCo happens to be one of the four companies, in the Atacama Desert in Chile, that holds close to 50% of the world’s lithium reserves.
The full featured article can be read on line at: http://metalsnews.com/t1196893i.
About LiCo Energy Metals: https://licoenergymetals.com/
LiCo Energy Metals Inc. is a Canadian based exploration company who’s primary listing is on the TSX Venture Exchange. The Company’s focus is directed towards exploration for high value metals integral to the manufacture of lithium ion batteries.
Glencore Bucke Cobalt Project, Cobalt, Ontario:
The Company has entered into a property purchase agreement to acquire a 100% interest from Glencore Canada Corporation (subsidiary of Glencore plc) in the Glencore Bucke Property, situated in Bucke Township, 6 km east-northeast of Cobalt, Ontario, subject to a back-in provision, production royalty and off-take agreement. Strategically, the Glencore Bucke Property consists of 16.2 hectares and sits along the west boundary of LiCo’s Teledyne Cobalt Project. The Property covers the southern extension of the #3 vein that was historically mined on the neighbouring Cobalt Contact Property located to the north of the Glencore Bucke Property. Diamond drilling in 1981 on the Glencore Bucke Property delineated two zones of mineralization measuring 150m and 70m in length.
Ontario Teledyne Cobalt Project:
The Company has an option to earn 100% ownership, subject to a royalty, in the Teledyne Project located near Cobalt. Ontario. The Property adjoins the south and west boundaries of claims that hosted the Agaunico Mine. From 1905 through to 1961, the Agaunico Mine produced a total of 4,350,000 lbs. of cobalt and 980,000 oz. of silver. A significant portion of the cobalt that was produced at the Agaunico Mine located along structures that extended southward onto the Teledyne property. The Company completed a total of 11 diamond drill holes totaling 2,200 m in the fall of 2017. The drilling has confirmed cobalt mineralization present on the Property which is consistent with historical grades as reported historically by Cunningham‐Dunlop (1979) and Bressee (1981), disclosed in earlier news releases. These reports are available in the public domain through MNDM’s AFRI database.
NI 43‐101 Reports for both the Teledyne and Glencore Bucke Properties, are publicly available on www.SEDAR.com as well as the Company’s website. LiCo’s recently completed diamond drilling program (September to December 2017) consisted of both twinning and infill drilling of the historical drill holes located on both the Teledyne Cobalt and Glencore Bucke Properties.
Chile Purickuta Lithium Project:
The Purickuta Project is located within Salar de Atacama, a salt flat encompassing 3,000 km2, being about 100 km long, 80 km wide and home to approximately 37% of the worlds Lithium production and Chile itself holds 53% of the world’s known lithium reserves (Source: Bloomberg Markets – June 23, 2017, “Lithium Squeeze Looms as Top Miner Front‐Loads, Chile Says”). The property is 160 hectares large and is enveloped by a concession owned by Sociedad Quimica y Minera (“SQM”) and lies within a few kilometers of a property owned by CORFO (the Chilean Economic Development Agency) where its leases land to both SQM and Albermarle’s Rockwood Lithium Corp. (“Albermarle”) for lithium extraction. Together these two companies, SQM and Albermarle, have a combined annual production of over 62,000 tonnes of LCE (Lithium Carbonate Equivalent) making up 100% of Chile’s current lithium output. As reported in The Economist (June 15, 2017 – A battle for supremacy in the lithium triangle), the Salar de Atacama has the largest and highest quality proven reserves of lithium. The combination of the desert’s hot sun, scarce rainfall, and the mineral‐rich brines make Chile’s production costs the world’s lowest. This together with a favourable investment climate, low levels of corruption, and the quality of its bureaucracy and courts makes Chile a favourable place to conduct business.
Nevada Dixie Valley Lithium Project:
The Company has an option to acquire a 100% interest, subject to a 3% NSR, on a large lithium exploration project at the Humboldt Salt Marsh in Dixie Valley, Nevada. Some important geological similarities exist between various lithium brines, notably geothermal activity, a dry climate, a closed basin, an aquifer, and tectonically driven subsistence exist at Dixie Valley along with Clayton Valley and various lithium bearing salars in Chile, Argentina and Bolivia.
Nevada Black Rock Desert Lithium Project:
The Company has entered into an option agreement whereby the Company may earn an undivided 100% interest, subject to a 3% NSR, in the Black Rock Desert Lithium Project in southwest Black Rock Desert, Washoe County, Nevada.
On Behalf of the Board of Directors
Tim Fernback, President & CEO
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Disclaimer for Forward-Looking Information:
This news release may contain forward‐looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward‐looking. Forward‐looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward‐looking statements.